Gang Run Savings Calculator

Calculate savings from combining multiple jobs on one press sheet.

Total separate jobs to be ganged together.
jobs
Cost of each individual makeready/setup.
$/job
Average running cost if printed individually.
$/job
Single makeready cost for the ganged sheet.
$
Total running cost for the combined gang sheet.
$
Average number of pieces per job.
pieces

Results

Individual Total:
Total cost if all jobs printed separately.
-
Gang Run Total:
Total cost with all jobs ganged together.
-
Total Savings:
Dollar savings from gang run vs individual.
-
Savings Per Piece:
Average savings per finished piece.
-
Reference: PIA/GATF imposition and gang run best practices.